Case Study: Wind Power Coolant Hose Installation

2026-08-17 09:00
Case Study

Case Study: Wind Power Coolant Hose Installation

Blue wind power silicone hose with 4-layer fabric and steel wire reinforcement installed in turbine nacelles for gearbox coolant transfer.

Background

The customer required high-purity silicone tubing that could withstand repeated CIP/SIP cycles while maintaining low extractable levels for critical pharmaceutical processing. Their existing tubing showed inconsistent batch-to-batch performance and occasional extractable failures.

Challenge

The key challenges included:

  • Maintaining ultra-low extractables across production batches
  • Withstanding repeated SIP cycles at 121 °C without degradation
  • Ensuring consistent dimensional tolerances for automated filling equipment
  • Meeting USP Class VI and ISO 10993 biocompatibility requirements

Solution

Rekky supplied platinum-cured silicone tubing with documented batch-to-batch consistency. Each production batch was tested for extractables, dimensions and visual quality, with full COA documentation provided.

Results

After switching to Rekky tubing, the customer reported:

40%
Reduction in extractable levels
99.8%
Batch acceptance rate
50+
SIP cycles with no failure
15%
Improvement in batch yield

Conclusion

The switch to Rekky platinum-cured silicone tubing delivered measurable improvements in purity, consistency and operational efficiency. Full compliance documentation and batch traceability gave the customer confidence in their regulatory filings.

Interested in similar results? Request a consultation or order free samples for evaluation.

Have questions about silicone tubing?

Our engineering team is ready to help with product selection, technical specifications and compliance questions.

← No Previous No Next →